- Overview
- Recommended Products
- With all the technical advantages,we promise customer one year warranty.
- Low price spare parts provide beyond warranty period.
-
zhengzhou hongle is your best partners!
Electromagnetic Roasting Machine For Peanut / Sunflower Seeds / Almond
Advantage of the Electromagnetic Roasting Machine For Peanut / Sunflower Seeds / Almond:
1. environmental protection: the machine is using electromagnetic heating, no carbon emissions, carbon dioxide emissions to the operating environment is zero.
2. low consumption: the machine uses a composite pan / drum. Heat protection can not be scattered outside, the thermal efficiency of more than 95%, more than the traditional electric heating drying equipment save more than 45%.
3. time saving and power saving: drum / pot direct heating does not require any heat transfer mode, boot 30 seconds that can reach 100 degrees, improve work efficiency and reduce heat energy waste in the conduction process. Bake 5kg original melon seeds, power consumption 0.6 degrees, 5kg sesame power consumption 0.55 degrees.
4. high temperature: the highest temperature can reach 400 degrees centigrade.
5. man-machine interface: humanized design, intelligent control. Parameter setting is convenient and quick.
6. temperature control precision: operation skills requirements are low, in baking and baking operation temperature control accuracy up to + 2%, to ensure the quality of fried products each pot is the same, the color is consistent. Therefore, the operator skills requirements are low, can reduce recruitment requirements standards.
7. fault self diagnosis function, fault display at a glance.
8. low voltage: the machine uses 220V voltage, more convenient to use.
9.the use of materials: all stainless steel materials, to ensure the health and safety of baked products, conform to the GMP standard.
Technical parameters of the Electromagnetic Roasting Machine For Peanut / Sunflower Seeds / Almond:

Model |
Capacity |
Power |
matching power |
Voltage |
Outline Size (cm) |
Boiler body size |
HLDZ 3-4 |
10-15KG/H |
0.6-3KW |
0.18KW |
220V |
75*52*80 |
300*400mm |
HLDZ 3-6 |
15-20KG/H |
0.7-3.5KW |
0.18KW |
220V |
90*52*80 |
300*600mm |
HLDZ5-4 |
8-20KG/H |
1-5kw |
0.25KW |
220V |
100x73x130 |
500x400mm |
HLDZ5-5 |
10-30KG/H |
1.5-7.5KW |
0.4KW |
380V |
103x73x130 |
500*500mm |
HLDZ5-10 |
30-60KG/H |
3-15KW |
0.4KW |
380V |
153x73x119 |
500x1000mm |
HLDZ7-10 |
50-250KG/H |
6--30KW |
1.1KW |
380V |
160x102x147 |
700x1000mm |
HLDZ7-15 |
100-350KG/H |
9--45KW |
1.5KW |
380V |
200x102x147 |
700x1500mm |
HLDZ9-16 |
150-300KG/H |
12--60KW |
3KW |
380V |
200x110x170 |
900x1600mm |
HLDZ12-16 |
150-300KG/H |
16 -80KW |
4KW |
380V |
250x155x220 |
1200x1600mm |
Related product
Small model roaster
Nuting Coating machine
Packing: Based on the customers' need adopt the wooden case or wooden pellets, etc.
Transportation:shipping, train, express or upon clients' demands.
Zhengzhou hongle Machinery Equipment Co., Ltd has been designing, developing, manufacturing and marketing Machinery for more than 12 years.After these years of development, we have high quality professional teams, skillful talents, strong technical force, strong and independent research and development capabilities, advanced production equipment and a perfect aftersales service system. So choose us, equaling to choose the competitive price and stable quality both.
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 7 days.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.