High Quality 400 Kg Chain Type Dry Garlic Onion Peeling Machine Auto Garlic Skin Peeler Machine
- Overview
- Details
- Automatic Garlic Peeling Line
- Applications
- Customer Cases
- FAQ
- Recommended Products
Product Description


Specifications of Garlic Peeler
Model |
parameters |
HLL-200 |
voltage: 1KW/220V weight: 220(KG) machine size: 1400*500*1450(MM) capacity: 200(KG/H) |
HLL-400 |
voltage: 1KW/220V weight: 240(KG) machine size: 1600*500*1450(MM) capacity: 400(KG/H) |
HLL-600 |
voltage: 1KW/220V weight: 280(KG) machine size: 1800*580*1520(MM) capacity: 600(KG/H) |
HLL-1000 |
voltage: 2.25 KW/220V weight: 450(KG) machine size: 2500*1000*1700(MM) capacity: 1000(KG/H) |
HLL-2000 |
voltage: 3.7 KW/220V weight: 550(KG) machine size: 3000*1000*1700(MM) capacity: 2000(KG/H) |
Details of Garlic Peeling Machine


Automatic Garlic Peeling Line
The garlic processing plant is composed of elevator, garlic separating machine, garlic
peeling machine and selecting conveyor,packing machine for canned garlic. You can also equip with color sorting machine, washing machine, drying machine, garlic paste making machine etc. The capacity is 300-2000 kg per hour. Preferably dried garlic.
Automatic garlic peeling production line is specially designed for peeling skin of garlic.also can equip with packing machine line for canned(bottle) garlic.The processing line is included the garlic conveyor,garlic clove break machine,garlic peeling machine,pick line.The capacity range is from 200kg/h to 5000kg/h.We can offer the suitable solution according to customer's budget and request.
Garlic Clover
Garlic Sorter Machine
Bubble Washing Machine



Applications of Garlic Peeling Machine
FAQ
1) When can I get the price?
We usually quote within 24 hours after receiving your inquiry. If you need a quote urgently, please call or email us to let us know so that we can prioritize your inquiry.
2) How do you price?
We price based on comprehensive costing. Since we are a manufacturer, our prices are lower than those of trading companies. You will get more competitive prices and better quality.
3) Can you guarantee the quality?
Of course. We are a manufacturing factory. What's more, we attach great importance to our reputation. Always taking the best quality as the principle, you can be completely assured of our production.
4) How long does the whole process take?
After placing an order, the production processing time is about 30-45 days. We need 7 days to prepare all the materials and then 30 days for production.
5) How about the shipping and delivery date?
Usually we use shipping to transport the goods, which takes about 25-40 days, which also depends on your country and port. If there is an emergency, we can send the goods by air express, as long as you can afford the shipping cost.