Automatic Egg Grader Size Weight Sorting Grading Packing Processing Machine Chicken Egg Cleaning and Weight Sorter Machine
- Overview
- Recommended Products

conveyor line, the equipment can be automatically distributed to different collection baskets according to the weight of the egg.
Model |
HL-EG-5/7 |
Capacity |
6000pieces/h |
Power |
400w |
Voltage |
220v |
Sorting level |
5/7 |

The cleaning egg cleaning series has changed the traditional processing technology, and the egg processing industry has since moved to large-scale and industrial production. This set of equipment consists of egg laying, cleaning, air drying, light inspection, and belt collection.
Feature :
1. The frame structure is made of high quality 304 stainless steel profiles, which have excellent anti-corrosion and anti-alkali properties. The structure is reasonable and durable.
2. Equipped with spray pipe, the cleaning part is equipped with double-row washing eggs. The egg keeps rotating during the conveying process. The horizontal brush is used to wash the eggs in multiple directions. The brush roller is a three-stage cleaning.
3. Using engineering plastic parts produced by mold, rubber parts can meet the anti-corrosion requirements on the basis of ensuring mechanical properties. Greatly improve the service life of the equipment.
4. Wear-resistant silk brush, super brushing ability, durable wear
HL-BJ-8000 cleaning egg production line process:
Eggs on the suction cup: quick and easy.
Light inspection: professional LED light source picks out cracked, yellow, deformed, sand and other unqualified eggs;
Spray cleaning: spray with warm water, brush, wash and decontaminate the surface of the egg;
Air drying: quickly dry the surface of the eggshell;
Sterilization: UV sterilization, eliminating the bacteria on the surface of the eggshell;
Injecting oil to keep fresh: prevent external bacteria from invading and achieve fresh-keeping purposes.
Production: 8000-10000 pieces / hour















PACKAGE:
Standard export carton packing.
DELIVERY TIME:
3-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.





