Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000

ALL PRODUCTS

Fruit Net Packing Machine Automatic Onion Potato Orange Nylon Mesh Net Bag Packaging Machine

  • Overview
  • Recommended Products

Fruit Net Packing Machine Automatic Onion Potato Orange Nylon Mesh Net Bag Packaging Machine

Product Description

mesh bag packing1

Parameters:

1. Model: HL-2

2. Voltage: 3-phase, 380V, 50HZ

3. Power: 2.9kw

4. Speed: about 25 bags/min

5. Air pressure: 6 bar

6. Air consumption: 1.5m3/h

Product features:
(1) The whole machine adopts hard carbon steel plate and stainless steel material, which is safe and sanitary, which greatly improves the corrosion resistance of the equipment.
(2) The network management is automatically replaced when the packaging net is used up.
(3) Adopt Airtec pneumatic components with stable performance and long service life.
(4) The combination of two positioning gears and proximity switches is used to make the screen pushing accurately in place.
(5) LS frequency converter with reliable performance and convenient operation, Schneider PLC and touch screen electrical control are adopted.
(6) The packaging size is relatively standard.
(7) It is convenient and quick to replace the packaging ties.
(8) The operation interface is popular, simple and convenient.

Packaging & Shipping

Packing: inside plastic bag, outside wooden case for poultry feed pellet making machine (Based on the customers' need adopt the wooden case or wooden pellets, etc.).

Transportation:shipping, train, express or upon clients' demands. 

packing shipping

Company Information

Zhengzhou hongle Machinery Equipment Co., Ltd has been designing, developing, manufacturing and marketing Machinery for more than 12 years.After these years of development, we have high quality professional teams, skillful talents, strong technical force, strong and independent research and development capabilities, advanced production equipment and a perfect aftersales service system. So choose us, equaling to choose the competitive price and stable quality both.

photobank (3).jpg

Our customers

customer

Our Services
  • With all the technical advantages,we promise customer one year warranty.
  • Low price spare parts provide beyond warranty period.
  • zhengzhou hongle is your best partners!

photobank (2).jpg

1. Installation and Debugging: Within the time of warranties, the seller willsend the engineer to guide to install the machine, the buyer should prepare thematerials needed and should be responsible for the engineer’s safety, travelexpense, accommodation abroad. And shall pay the salary for the engineer,150 dollars per day, and if the installation would exceed one month, then thebuyer shall pay the engineer 200 dollars per day for the exceeding time. Andthe seller will provide the Instruction Manual and the Foundation Drawings.

2. The quality assurance date is one year (exclude the quick wear parts) aftercommissioning, but not exceed 15 months from date on whichmachine leavesthe factory.

3. If the equipment appear the equipment failure because of improperhandling

of user, we are in charge of maintenance, and collect the appropriate cost.

4. We offer the components with favorable price, perdurable maintenance.

After quality assurance date, if the equipment needs to be repaired, we onlycollect the cost price

FAQ

1) When can I get the price?

We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority. 

2) How do you make your price?

We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.

3) Can you guarantee your quality?

Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.

4) How long does the whole procedure being worked out?

After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

Contact me

If you want to know more

Please feel free to contact Ritta

Ritta.png

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000