Stainless Steel Small Scale Frozen Potato Chips Plantain Chips Making Machines Banana Processing Plant Plantain Chips
- Overview
- Recommended Products
- With all the technical advantages,we promise customer one year warranty.
- Low price spare parts provide beyond warranty period.
- zhengzhou hongle is your best partners!
Stainless Steel Semi-automatic Small Scale Frozen Potato Chips Making Machine Fryer French Fries Production Line Price
Potato Cleaning Peeling Machine -----French Fries Cutter Machine -----Vegetable Blanching Machine-----Dewater Washing-----French Fries Fryer Machine-----Deoiling -----Flavoring machine -----Potato Chips Packing Machine
1.Potato Cleaning Peeling Machine
The brush type cleaning and peeling machine can complete the cleaning and peeling work at the same time. High efficiency, low wastage.
Parameters:
Size (MM) |
Weight (KG) |
Power /voltage |
1780*850*800 |
220 |
1.5 |
2.French Fries Cutter Machine
Cut strip size can be adjusted .
Size (MM) |
Weight (KG) |
Power /voltage |
950*800*950 |
110 |
1.1 |
3.Vegetable Blanching Machine/French Fries Fryer Machine
Machine is used for blaching potato chips or strips by add water , or frying potato chips or strips by add oil.
Size (MM) |
Weight (KG) |
Power (KW) |
2200*700*950 |
180 |
42 |
4.Dewater Washing/Deoiling Machine
The machine is used for blanching potato chips. The potatoes do not change color and are fried.
Size (MM) |
Weight (KG) |
Power /voltage |
1200*700*750 |
420 |
2.2kw/380v |
5.Flavoring machine
The drum seasoning machine is made of stainless steel. Potato chips (strips) are uniformly rotated in the rotation of the drum, and sprinklers or sprays are added to the seasoning. The seasoning is even and not fragile.
Size (MM) |
Weight (KG) |
Power /voltage |
1100*1000*1300 |
150 |
1.5 |
Packing: inside plastic bag, outside wooden case for poultry feed pellet making machine (Based on the customers' need adopt the wooden case or wooden pellets, etc.).
Transportation:shipping, train, express or upon clients' demands.
Zhengzhou hongle Machinery Equipment Co., Ltd has been designing, developing, manufacturing and marketing Machinery for more than 12 years.After these years of development, we have high quality professional teams, skillful talents, strong technical force, strong and independent research and development capabilities, advanced production equipment and a perfect aftersales service system. So choose us, equaling to choose the competitive price and stable quality both.
1. Installation and Debugging: Within the time of warranties, the seller willsend the engineer to guide to install the machine, the buyer should prepare thematerials needed and should be responsible for the engineer’s safety, travelexpense, accommodation abroad. And shall pay the salary for the engineer,150 dollars per day, and if the installation would exceed one month, then thebuyer shall pay the engineer 200 dollars per day for the exceeding time. Andthe seller will provide the Instruction Manual and the Foundation Drawings.
2. The quality assurance date is one year (exclude the quick wear parts) aftercommissioning, but not exceed 15 months from date on whichmachine leavesthe factory.
3. If the equipment appear the equipment failure because of improperhandling
of user, we are in charge of maintenance, and collect the appropriate cost.
4. We offer the components with favorable price, perdurable maintenance.
After quality assurance date, if the equipment needs to be repaired, we onlycollect the cost price
1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
2) How do you make your price?
We make the price according to our comprehensive costing. And our price will lower than the trade company because we are manufacture.You will get competitive price and better quality.
3) Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
4) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 30-45 days. We need 7 days to prepare all the stuff then 30 days for manufacturing.
5) What about the transportation and delivery date?
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.
If you want to know more
Please feel free to contact Ritta